Southeren Railway

Project Value: 71,103,194/-
Total TKM:  12 TKM
Project Duration:  10 Months
Work Description: 

OHE Electrification works on the 3rd line between Tambaram (TBM) and Guduvancheri (GI) stations in connection with laying of 3rd line between Tambaram – Chengalpattu section in Chennai division of Southern Railway (Tambaram – Chengalpattu Section )